Circular Advantage Programme · Miami-Dade County

Two paths to turn Miami-Dade's
waste into a revenue stream

A decision-ready overview for commissioners and senior staff. Neither option requires any county capital. Facility operational in 24 months.

$0 county capital
Operational in 24 months
30-year programme
~$724M projected benefit · Phase Initial
Carbotura Advanced Circular Manufacturing facility interior — 1,000 TPD configuration
Carbotura Advanced Circular Manufacturing (ACM) Facility · 1,000 TPD Configuration
What Carbotura is

A manufacturing company.
Not a waste company.

Carbotura builds and operates ACM facilities — industrial plants that receive municipal and industrial materials as a manufacturing feedstock and convert them into synthetic graphite, recovered metals, and clean water. These are manufactured goods sold in global markets.

ACM is not incineration. It is not recycling. It is not waste treatment. The process runs in an oxygen-free, sub-atmospheric chamber using microwave catalytic energy. There is no combustion, no flame, and no stack emissions. Materials are not destroyed — they are reformed into products.

This classification matters: Carbotura operates under manufacturing North American Industry Classification System (NAICS) codes (Sector 31–33), not solid waste codes. The facility is a factory. The materials Miami-Dade delivers are its manufacturing inputs.

Deployable scale
400 — 5,000 Tonnes Per Day (TPD)
Tonnes per day · modular 100 TPD increments
Phase Initial 500 TPD
Phase Medium 2,000 TPD
Phase Expanded 5,000 TPD
Miami-Dade addressable volume: 7,225 TPD across all streams. Phase Initial (500 TPD) addresses 7% of total — this is the entry point, not the ceiling.
What the factory produces
Synthetic graphite
Recovered metals
Ultrapure water
Mineral aggregates

What Carbotura is offering Miami-Dade County

1
Zero capital from the county — ever

Carbotura designs, finances, builds, owns, and operates the facility entirely at its own cost. The county's only obligation is delivering waste. No bonds. No budget line. No balance sheet exposure at any phase from $305M through $3.47B full deployment.

2
Waste becomes a revenue stream — not just a cost

Carbotura converts waste materials into synthetic graphite, recovered metals, and clean water — manufactured products sold in global markets. Under both options, Miami-Dade begins receiving Circular Royalty™ payments starting Month 14. Cash the county earns back from materials it was previously paying to dispose of. What was an escalating cost becomes a source of income — the same waste the county was paying to get rid of now pays the county back.

3
Facility operational in 24 months — before the landfill crisis lands

South Dade Landfill reaches capacity around 2029. Phase Initial goes online by mid-2028 — ahead of the capacity crunch. That arrives before any Waste-to-Energy (WTE) contract ties Miami-Dade to 40 years of escalating rates.

4
Fixed cost certainty against an open-ended alternative

The proposed WTE contract prices at $105/ton rising indefinitely. Under the CSA, the Beneficiation Fee (TMC Fee) starts at $88/ton — $17 below WTE from Day 1. Both escalate at 2.5%/yr. The savings gap widens every year in Miami-Dade's favour for 30 years.

5
~$724M projected benefit — at 500 TPD, just 7% of addressable volume

$28.5M gross cost avoidance plus ~$696M in Circular Royalty™ received over 30 years. This is the floor, not the ceiling. At full deployment (6,000 TPD), Carbotura projects ~$8.69B — 12× Phase Initial. None of this requires county capital.

Standard
Fee + Royalty
Recommended starting position
Beneficiation Fee (Year 1)$88.00/ton
Annual escalator+2.5%/year
Saving vs. current cost$4.78/ton from Day 1
Circular Royalty™120% of the current-year Beneficiation Fee
Royalty escalator+1pp/year
Royalty startsMonth 14
Contract term30 years
County capital$0
Feedstock deliveryGuaranteed delivery required
Land requiredNone
Tax abatementNone required
Operational byT0 + 24 months
Royalty Only
County contributes land and inputs
Beneficiation Fee$0 — waived entirely
Annual escalatorN/A
Saving vs. current costFull $92.78/ton avoided
Circular Royalty™Negotiated — royalty only
Royalty startsMonth 14
Contract term30 years
County capital$0
Feedstock deliveryGuaranteed delivery required
Land requiredDeed land to Carbotura
Tax abatementRequired
Operational byT0 + 24 months
Optional add-on — available under the CSA
If Miami-Dade deeds an existing or closed landfill site to Carbotura, Carbotura will pay the county an additional $50/ton royalty on all material processed from that site. This converts a landfill closure liability — estimated at $25M+ per site — into a long-term income instrument. South Dade Landfill, approaching capacity around 2029, is the primary candidate. The landfill becomes a feedstock asset rather than a remediation obligation.

What the county receives

$88
Beneficiation Fee/ton
Year 1
$4.78
Savings/ton vs.
current Feedstock Waste Disposal Cost (FWDC)
~$696M
Circular Royalty™ received
over 30 years
~$724M
Employment figures below represent regional economic effects — not county fiscal receipts. Direct FTE and indirect employment are distinct from and additive to the fiscal effects above.
~125
Direct Full-Time Equivalent (FTE)
Phase Initial · 500 TPD
~375
Indirect / induced jobs
regional economic effect
$40M+
Annual economic impact
Phase Initial · estimated

Employment scaled from Carbotura standard 400 TPD baseline (100 direct FTE / $32M+ annual impact). All figures ESTIMATED. Phase Medium (2,000 TPD): ~500 FTE / ~1,500 indirect. Phase Expanded (6,000 TPD): ~1,500 FTE / ~4,500 indirect.

Programme scale · Royalty projections

Circular Royalty™ at every scale — 400 to 5,000 Tonnes Per Day (TPD)

Scale Annual volume (TPY) Beneficiation Fee/yr · Year 1 Circular Royalty™/yr · Year 2 Est. 30-yr Royalty total Direct jobs (FTE)
400 TPD · Carbotura standard baseline 146,000 $12.85M $15.4M ~$769M ~100
500 TPD · Phase Initial (MDC scope) 182,500 $16.1M $19.3M ~$964M ~125
1,000 TPD 365,000 $32.1M $38.5M ~$1.92B ~250
1,500 TPD 547,500 $48.2M $57.8M ~$2.88B ~375
2,000 TPD · scale-card milepost 730,000 $64.2M $77.1M ~$3.84B ~500
2,500 TPD 912,500 $80.3M $96.4M ~$4.81B ~625
3,000 TPD 1,095,000 $96.4M $115.6M ~$5.77B ~750
3,500 TPD 1,277,500 $112.4M $134.9M ~$6.73B ~875
4,000 TPD 1,460,000 $128.5M $154.2M ~$7.69B ~1,000
4,500 TPD 1,642,500 $144.5M $173.4M ~$8.65B ~1,125
5,000 TPD · scale-card ceiling 1,825,000 $160.6M $192.7M ~$9.61B ~1,250

Royalty figures are amounts received. The royalty is paid 13 months in arrears, so the figure shown for a year is earned on the previous year’s delivered tonnage.

Beneficiation Fee (Total Material Conversion Fee): $88.00/ton Year 1 · +2.5%/yr escalator · Circular Royalty™: 120% of that year's Beneficiation Fee · +1 percentage point/yr · payments begin Month 14 (rolling lagged cash flow) · 30-yr totals: Carbotura planning-basis ESTIMATED · linear scaling from verified Phase Initial projection · Beneficiation Fee and Circular Royalty™ are independent transactions — gross figures shown separately per programme terms · Direct jobs (FTE) scaled linearly from Carbotura standard 400 TPD baseline (100 direct FTE per facility) · indirect/induced employment runs at ~3× direct (regional economic effect, distinct from facility headcount) · Miami-Dade County addressable volume: 7,225 TPD · Phase Initial addresses 7% of total

Decision summary

What each option requires and returns

All financial figures are Carbotura planning-basis estimates. FWDC $92.78/ton VERIFIED per Miami-Dade Department of Solid Waste Management (DSWM) Disposal Facility Fee Schedule, October 1, 2025. All projections ESTIMATED. Employment figures ESTIMATED from Carbotura standard 400 TPD performance baseline — linear scaling. Final terms subject to Circular Supply Agreement (CSA) negotiation. Prepared by Carbotura, Inc. — the proposing vendor.